In short
The Eisenbahngesellschaft Ostfriesland-Oldenburg (e.g.o.o.) received its first EuroRunner on 20.05.2010, numbered 223 141. The locomotive was part of a batch of stock locomotives, built at the Netinera workshops at Neustrelitz. After three months the loco traded its white stock locomotive livery for the green Enercon livery.
On 10.05.2012, almost two years later, a second EuroRunner was added to the e.g.o.o. fleet, numbered 223 156. This locomotive was part of a last batch of EuroRunners built in stock production.
1st order |
1 locomotive |
Order date: __.__.2010 |
Delivery date: 20.05.2010 |
> Designation: 223 141 |
2nd order |
1 locomotive |
Order date: __.__.2012 |
Delivery date: 10.05.2012 |
> Designation: 223 156 |