Freight services have now resumed between Calais and Dunkirk, following the re-building and electrification of the line. Passenger services will be re-introduced on 14 December. Photo below of 66045 on 61330 10:50 Caffiers - Dunkerque Grande Synthe crossing the lifting bridge at Gravelines on Wednesday 15 October. The re-building has included re-instating double track over the bridge. The locomotive is crossing the lifting section where the overhead wires have been replaced by a solid conductor rail.
(PL)